Location: Rumaila, Basra
Start Date: April 2015
Finish Date: Ongoing
Client: BGC/Shell
ME&I Works Contract Number. UI 55267 (WO-2)
Under Frame Work Agreement Contract No. UI52427

Construction consists of installation and testing of a 20” suction pipeline of an approximate total length of 1 Km, a 12” discharge pipeline of an approximate total length of 1.8 Km and associated tie-ins. Scope includes commissioning and start-up support for pipeline installations & tie-ins.

Location: Rumaila, Basra
Start Date: April 2015
Finish Date: Ongoing
Client: BGC/Shell
Works Contract Number. UI 55258 (WO-1)
Under Frame Work Agreement Contract No. UI52427

Removal of Berms from project sites of existing compressors stations CS2, CS3, CS4 and CS5

Location: Karbala
Start Date: April 2015
Finish Date: Ongoing
Client: HDGSK Unincorporated JV

Civil work (Tanks, foundations, sleepers, manhole, paving, roads and earth work) in Karbala refinery.

Location: Rumaila, Basra
Start Date: February 2015
Finish Date: Ongoing
Contract Number: UI 45601- VO2
Client: BGC/Shell

Leveling, earth works, fabrication, construction and installation of a number of civil structures designed to support Qurainat temporary compression facilities.

Location: Umm Qasr, Basra
Start Date: January 2015
Finish Date: Ongoing
Client: GE / BGCl

Manpower, Equipment, logistics, transportation, and other Services in support of pump rehabilitation in Umm Qasr Terminal.

Location: Rumaila, Basra
Start Date: September 2014
Finish Date: Ongoing
Client: BGC/Shell

Mechanical, Electrical and Instrumentation works for off plot piping between existing NGL plant and new inlet booster compression station and Mechanical, Electrical and Instrumentation Works at North Rumaila Inlet Booster Compressor Station.

Location: Rumaila, Basra
Start Date: November 2013
Finish Date: Ongoing
Client: BGC/Shell

Manpower, Equipment, logistics, transportation, other Services in support of rehabilitation of Gas Compressors in Rumaila Oil Field.

Location: Zubair, Basra
Start Date: 10th September 2014
Finish Date: 15th February 2015
Client: BGC/Shell

Construction, Mechanical, Electrical and Instruction works for temporary gas compressing units (4 units) with all related BOP. Scope also included construction of 1 km of 12” and 20” off-plot pipelines.

Location: Zubair, Basra
Start Date: 20th May 2014
Finish Date: 13th Oct 2014
Client: BGC/Shell

Leveling, earth works, fabrication, construction and installation of a number of civil structures designed to support Zubair Temporary compression facilities.

Location: Zubair, Basra
Start Date: October 2012
Finish Date: May 2014
Client: STX HI /ENI

Civil Construction, Mechanical, Electrical and Instrumentation in 3x Degassing Stations (Zubair, Zubiar Mishrif, and Hammar Mishrif) as well as installation of 2x dehydrators, 2x desalters, and an export metering skid with well guard facility. The scope also included the conversion of 22x Oil wells into water injection wells and erection of 4x water storage tanks. The Project involved around 30 shut downs and 50 tie-ins. Total welding + NDT performed is 110,000 D.inch .

Location: Zubair, Basra
Start Date: September 2012
Finish Date: March 2013
Client: STX HI /ENIl

Supply and Installation of Temporary Facility for Iraq Zubair Existing DGS Modification Project.