on-Going & Past-Performance Projects

Location: Amara, Maysan
Start Date: April 2013
Finish Date: Ongoing
Client: STX HI/ MoE

Construction, Testing & Commissioning Support for 4x Gas Turbine units GE Fr9 (125 MW each) running on Natural Gas and Diesel, including all Civil, Electrical and Mechanical Works.

Location: Buzurgan, Maysan
Start Date: 11 July 2011
Finish Date: 21 Feb 2014
Client: MoE

Design, Engineering, Supply, Construction, Testing and Commissioning on Turnkey Basis for 2x Gas Turbine units swift pack FT8 (60 MW each) running on Natural Gas and Diesel, including all civil, Electrical and Mechanical Works.

Location: Al Shoaiba, Basra
Start Date: 29 Jan 2013
Finish Date: 15 Jan 2014
Client: DAJ

  • Supply, erection and installation of Heavy Fuel Oil (HFO) main storage, settling and service tanks with capacity (1X1500 m³ + 2X1500 m³ + 2X1000 m³) at Al Shoaiba Gas Turbine Power Plant.
  • Supply, erection and installation of Diesel Fuel Storage and Sludge Tanks with capacity ( 1X1000 m³ + 1X500 m³) at Al Shoaiba Gas Turbine Power Plant.
  • Civil works for buildings, main GTG foundations, auxiliary foundations, trenches, camp, etc.

Location: Amara, Maysan
Start Date: February 2013
Finish Date: December 2013
Client: STX HI/ MoE

Supply and Installation of Temporary Facility for AMARA Gas Turbine Power Plant.

Location: Najaf
Start Date: September 2011
Finish Date: January 2013
Client: MoE

Construction of the 55.3 MW ALSTOM GT on Natural Gas and Diesel, testing and commissioning of main unit and balance of plant.

Location: Hartha, Basra
Start Date: June 2012
Finish Date: December 2012
Client: DAJ

Construction of the 100 MW for 6 mobile units TM 2500 including civil, mechanical, electrical, testing and commissioning of main unit and balance of plant.

Location: Maysan
Start Date: November 2011
Finish Date: June 2012
Client: STX HI/ MOE

Construction of the 200 MW STX DG plant (4 MW X48 unit) including civil, mechanical, electrical, testing and commissioning for the whole plant.

Location: November 2011
Start Date: November 2011
Finish Date: June 2012
Client: STX HI/ MOE

Construction of the 200 MW DG plant (7.8 MW X 28 unit) including civil, mechanical, electrical, testing and commissioning for the whole plant.

Location: Wassit
Start Date: October 2010
Finish Date: August 2011
Client: SEC/ MOE

Construction of pre-cast pile project on oil tank farm.

Location: Al Hartha, Basra
Start Date: March 2010
Finish Date: November 2010
Client: TPE/ MOE

Construct Residential and Office Camp for Technopromexport (TPE) for rehabilitation and completion of the Al Hartha TPS.

Location: Sulaymaniyah, Kurdistan Region
Start Date: April 2013
Finish Date: Ongoing
Client: STX HI/ MoE

Construction, Testing & Commissioning Support for 4x Gas Turbine units GE Fr9 (125 MW each) running on Natural Gas and Diesel, including all Civil, Electrical and Mechanical Works.

Location: Wassit
Start Date: November 2009
Finish Date: March 2010
Client: SEC/ MOE

Survey, geotechnical engineering investigation, pile testing and reporting.

Location: Hilla, Babil
Start Date: January 2008
Finish Date: July 2009
Client: MOE

Rehabilitation, installation, testing and Commissioning of (3) GE Frame 5 Gas Turbines Units 6, 7, and 8

Location: Nation-Wide
Start Date: July 2007
Finish Date: September 2007
Client: IPA-GRD

    Trouble shooting, urgent repairs, rehabilitation & maintenance works in Power Plants all over Iraq. This work included the following activities:-

  • Al Doura TPP: Performed all required maintenance on MCC electrical building and laying power supply cables for Generator unit (5).
  • Performed maintenance work on Al Doura TPP Boiler 500 Cº, Blower (5).
  • Al Qudas GTPP: Testing work the Generator Unit (8) type LM 6000 and Commissioning of this unit.
  • Al Qudas GTPP: Checked the Alignment situation unit (7) type LM 6000.
  • Al Qudas GTPP: Replacement of gas used in the converted chillers of LM 2500 from R-22 to R- 407 including providing required oil type RL 68H.
  • Baiji TPP: inspection of the regulator valves.
  • Baghdad South: conducting IR infrared thermo graphic Survey and inspection to determine the situation of transformers, switch gears and substation.
  • Performed the Generator testing and protection work for Al Mussaib GTPP LM 6000 units (1, 2, 3, 4) and retired testing for substation and switchgears.
  • Al Mussaib GTPP: Repairing works on oil tank No (125-B) and discharge pipe, and conducting vacuum, filling and settlement tests.

Location: Nation-Wide
Start Date: September 2006
Finish Date: July 2007
Client: WII

Trouble shooting, Urgent repairs, rehabilitation & maintenance works in Power Plants all over Iraq.

This work included the following activities:-

  • Tazza GTPP: Calibration work for Siemens unit # 1 (65 MW).
  • Baiji TPP Rewinding of generator stator unit # 3 with Ansaldo Company.
  • Al Qudas GT PP Re-commissioning of H-17 & H-18 in 400kV substation.
  • Al Qudas GT PP Cladding of Chimneys for units # 3 & 4.
  • Al Qudas GT PP Commissioning of LM6000 unit # 8.
  • Al Dora TPP Replacing air heater baskets for all units.
  • Al Dora TPP Replacing damaged parts of firefighting system.
  • Al Dora TPP Replacing damaged parts of water treatment system.
  • Al Mussaib TPP Alignment of turbine unit # 2 with Siemens.
  • Al Mussaib TPP Acid cleaning for boiler No. 2
  • Al Mussaib TPP Maintenance work for water intake.
  • Al Mussaib TPP Maintenance work for fuel heaters.
  • Al Nassiryiah TPP Alignment & FWP for unit #3.
  • Al Nassiryiah TPP replacing the damaged burners of boiler # 4.
  • Al Nassiryiah TPP Replacing the damaged LP rotor with TPE Company.
  • Al Shauiba GT PP Maintenance for air intake filter house.
  • Al Qudas GTPP rehabilitation works for plant switchgear.
  • Al Qudas GTPP shedding works for unloading stations for Fr.9E units and LM 6000 units.
  • Baiji TPP: maintenance and operation work for 6 chillers related to GE mobile GT units type LM2500.
  • Al Mussaib TPP rehabilitation work for boiler economizer no. (3)
  • Al Doura TPP unit (5) fabrication and supplying 216 air heater baskets.
  • Al Mussaib LM6000 GE units, working to complete the reaming erection work with making all required testing and commissioning.
  • Location: Al Qudas, Baghdad
    Start Date: January 2005
    Finish Date: June 2005
    Client: MOE

    Construction and Erection of four Crude Oil Tanks (4 x 5000 m3).

    Location: Baiji
    Start Date: July 2004
    Finish Date: Febuary 2005
    Client: Odebrecht

    Construction, erection, testing and commissioning of units 3 & 4 (2 x 159 MW) Siemens V94.2 Gas Turbine units. (Mechanical & Civil work only).

    Location: Baiji
    Start Date: September 2003
    Finish Date: January 2004
    Client: WII

    Civil works for foundations, trenches, & pipe concrete sleepers, for (8) Gas Turbines GE TM 2500 mobile units.

    on-Going & Past-Performance Projects

    Location: Dewaniyah, Samaweh
    Start Date:March 2014
    Finish Date: Ongoing
    Client: Hyosung/ MOE

    Civil and MEP design, supply of materials and equipment, civil works construction, electrical installations, testing and commissioning.

    Location: Al Fao, Basra
    Start Date: February 2014
    Finish Date: Ongoing
    Client:ALSTOM/ MOE

    Civil, Mechanical, Electrical Testing & Commissioning Works.

    Location:Wassit
    Start Date: March 2008
    Finish Date: February 2010
    Client: USACE

      Rehabilitation and extension including design, supply of equipment, civil works, installations, testing and commissioning.

    Location:Baghdad
    Start Date: April 2007
    Finish Date: May 2010
    Client: Symbion

    Construction including erection, installing, testing and Commissioning.

    Location: Sulaymaniyah, Kurdistan Region
    Start Date: October 2007
    Finish Date: August 2008
    Client: MGI

    Construction including Civil works.

    Location: Basrah
    Start Date: April 2007
    Finish Date: December 2007
    Client: Symbion

    Testing & Commissioning for 5 x 132 kV AIS Substations:

  • Qurna
  • Toba
  • Harbour
  • Garma
  • Hammar
  • Location: 5x Provinces,Southern Iraq
    Start Date: July 2006
    Finish Date: December 2007
    Client: PCO-SGE

    Construction including Civil, erection, installation, testing & Commissioning at:

  • Al Mutanabi
  • Al Shamiya
  • Al Kheer
  • Al Rafae
  • Al Zuite
  • Al Missan Plastic
  • Al Sanaia
  • Al Ammara
  • Al Fajer
  • Al Aslah
  • Al Shatra
  • Al Majed
  • Al Romitha
  • Location: Rumaila Field, Basra
    Start Date: April 2006
    Finish Date: June 2007
    Client: Siemens

    Construction including Civil, erection, installation, testing & commission.

    Location: North and Center of Iraq
    Start Date: January 2006
    Finish Date: April 2007
    Client: WII

    Testing and Commissioning for SCADA Systems for North Region Control Center (NRCC) and National Dispatch Centers (NDC)

    Location: Al Musharah Maysan
    Start Date: November 2005
    Finish Date: February 2007
    Client: Firstar

    Construction including civil, erection, installation, testing & commissioning.

    Location: Diyala
    Start Date: March 2006
    Finish Date:January 2007
    Client: WII

    Rehabilitation including Civil works, installing electrical equipment, testing and commissioning.

    Location: Iraq Nation Wide
    Start Date: November 2005
    Finish Date: January 2007
    Client: WII

    Installed Automated Monitoring & Control System for NRCC, SRCC and NDC of Communication System Project (SCADA).

    Location: Baghdad
    Start Date: December 2005
    Finish Date: December 2006
    Client: WII

    Rehabilitation works and maintenance services

    Location: Baghdad
    Start Date:September 2005
    Finish Date: October 2006
    Client: WII

      Construction, erection, installation, testing & Commissioning works

    Location: Wassit
    Start Date: February 2005
    Finish Date: September 2006
    Client: WII

    Construction including civil, erection and installation.

  • Al-Ezah,
  • Al- Karama,
  • Al- Moufaqiya,
  • Sheikh Saad,
  • Al- Dalmag,
  • Al- Hasheme,
  • Al- Ahrar.
  • Location: Najaf
    Start Date: February 2005
    Finish Date:July 2006
    Client: Odebrecht

    Assessment of network system.

    Location: Diyala
    Start Date: February 2005
    Finish Date: March 2006
    Client: WII

    Construction including civil, erection and installation.

  • Al-Nay
  • Al-Salem
  • Location: Baghdad
    Start Date: April 2005
    Finish Date: February 2006
    Client: Bechtel

    Construction including civil, erection and installation.

  • Al Mechaneik
  • Abu Disheer
  • Al Hassan Ebn Al Haithem
  • Location: Taji
    Start Date: May 2005
    Finish Date: December 2005
    Client: WII

    Installation, testing and commissioning of main Transformer.

    Location: Wassit
    Start Date: October 2010
    Finish Date: August 2011
    Client: SEC/ MOE

    Rehabilitation of civil works.

    Location: Nassiryah
    Start Date: October 2005
    Finish Date: September 2007
    Client: WII / B&V

    Erection & Installation of 33/11 kV Substation and all the Electro-Mechanical works for the main drainage pump Station.

    Location: Alexandria, Egypt
    Start Date: February 2008
    Finish Date: December 2008
    Client: Faculty of Commerce

    Rehabilitation of Electrical, Civil.

    Location: Cairo, Egypt
    Start Date: March 2008
    Finish Date: April 2009
    Client: Eastern Company

    Electrical Works.

    on-Going & Past-Performance Projects

    Location: Babil - Karbala
    Start Date:July 2006
    Finish Date: February 2008
    Client:PCO

    Constructions including civil foundations, assemble, erection of towers and ASCR cable stringing.

    Location: Samawa
    Start Date: May 2006
    Finish Date: November 2007
    Client:BWSC

    Engineering & design for 132 kV Towers.

    Location:Wassit
    Start Date: June 2006
    Finish Date: August 2007
    Client: WII

      Supply of cables , installation, testing and commissioning of feeders to 9x substations in same governorates.

    Location:Wassit
    Start Date: March 2006
    Finish Date: November 2006
    Client: USACE-GRS

    Replacement of electrical feeder overhead line between Al-Basrokiyah and Al Kut South including civil foundations, assemble, erection of towers, ASCR cable stringing, supply of poles and cables.

    Location: Wassit
    Start Date: March 2006
    Finish Date: October 2006
    Client: USACE-GRS

    Replacement electrical feeder overhead line between Al-Yabaniyah and Al Amarah Rd. including civil foundations, assemble, erection of towers, ASCR cable stringing, supply of poles and cables.

    Location: Wassit
    Start Date: March 2006
    Finish Date: October 2006
    Client: USACE-GRS

    Replacement of electrical feeder overhead line 11 kV between Al Kut South and Al Meegasis, civil foundations, assemble, erection of poles, ASCR cable stringing, supply of poles and cables.

    Location: Wassit
    Start Date: March 2006
    Finish Date: June 2006
    Client: WII

    Constructions including design, civil foundations, assemble, erection of towers, ASCR cable stringing and supply of towers and cables.

    Location: Wassit
    Start Date: 15 May 2005
    Finish Date: 27 Nov 2005
    Client: JCCI

    Supply of Cable, installation, testing and commissioning of Al-Ezza 2 x 33 kV Under Ground Feeders from Kut 132/33/11 kV SS to Al Izza 33/11 kV SS.

    Location: Basrah
    Start Date: August 2005
    Finish Date: October 2005
    Client: WII

    Assessment of overhead line.

    Location: Baghdad
    Start Date: December 2003
    Finish Date: January 2004
    Client: JCCI

    Supply of Cable, installation and testing.